USS Gerald Ford not expected to be fully operational until 2019. Cost is up to $12.8B, 22% above the 2008 budget request.
http://www.stripes.com/news/navy/gao-report-savages-navy-s-new-aircraft-carrier-1.239569
http://www.stripes.com/polopoly_fs/1.239567.1378457399!/menu/standard/file/Ford.pdf
They'll be glad to have it once its operational.